Description
”Toeing-in” Cable Concrete can prevent undermining of the channel.
A toe-in trench, 1 or 2 blocks deep, can be used to start the channel and prevent undermining of the system
”Toeing-in” Cable Concrete can prevent undermining of the channel.
A toe-in trench, 1 or 2 blocks deep, can be used to start the channel and prevent undermining of the system