Description
Cable Concrete stays in place after it has been installed.
Problem: Guiding water around a corner.
Solution: Cable Concrete 70
Performance: Installed 6/98, the installation was subjected to high flows (within 4 feet of the top of the channel) prior to completion. There was no movement of the unclamped / unanchored mats.
Contractor: Kiever Enterprises, Inc.
Engineer: U.S. Army Corps of Engineers
Location: Paterson, NJ.