Aeration Systems
Architectural Products
Barrier: Highway
Basements: Precast, Thermal-Krete
Box Culverts
Bridge: 3 Sided Rigid Frame
Bridge: Arch-Parabolic
Bridge: Arch-Culvert
Bridge: Abutment System- Precast
Bridge: Steel Beam Precast Deck
Buildings
Catch Basins
Chlorine Tanks
Communication Manholes
Curbs: Precast Curb
D.O.T. Products - NEW YORK STATE DEP. OF. TRANS.
Distribution Boxes
Dosing Chambers
Electrical Catalog
Erosion: Cable Concrete
Grease Interceptors
Headwalls
Leaching Chambers
Lift Stations
Lifting Procedures
Light Bases
Manhole: Communication
Manhole: Sanitary/Storm
Manhole: Power
Manhole: Pump Stations
Meter/Valve Pits "Water"
Monuments & Markers
Oil Separators
Parking Bumpers
PermEntry
Pipe, Concrete End Section
Power Manholes
Pull Boxes
Pump Tanks
Retaining Walls: Kast-Block
Retaining Walls: Kast-Block Max
Retaining Walls: Evergreen
Retaining Walls: Redi-Rock
Roof Slabs
RPZ-Vaults & Buildings
Sanitary/Storm Manholes
Septic Tanks
Septic Tanks: Accessories
Septic Tanks: Traffic
Septic Tanks: Venting
Square/Rect. Structures - Vaults - Chambers
Stormwater Detention
Stormwater Treatment
Transformer Pads
Trench Drain
Tunnels: Precast
Used Equipment for Sale
Utility Structures
Water Meter Structures
Locations, Approvals, Certifications & Warranties
History, Mission, Vision, and Pledge
Mini Catalog
Project Pictures
Video Links
Project Profiles < prev  |  next >
PRECAST PIER, Perrington, NY

 

Project Profile: Precast Pier: Perrington, NY

Project:  D262143 PRECAST PIER - Ramp A over I 490 - Perrington, NY

Contractor:  Sealand Contractors Corp.

Bid Date:   9-26-12

Item:   555.90000004 - PRECAST CONCRETE PIER SYSTEM

Install Time Line:  

July  8th- 4  Piers Installed

-Pier grouting was completed

        -Pier center void was filled 

-Strength was met prior to setting Pier Cap.

July 15th - Pier Cap Set

-Steel Girders were being set within days of cap setting 

Project Description:

                4 - Precast Pier Units - 31 Ton each -Approximately 10' wide x 42" thick x  13'-6" tall

                1 - Precast Cap Unit - 36 Ton - Approximately 43' long x 42" wide x 42" tall

                Epoxy Steel Reinforcement all Precast Elements

                Rebar Coupler System:  By Dayton Superior

130- #8 Sleeve Lock Couplers  Were used to secure Piers to CIP sub foundation 

Custom Forming / Custom Rigging / OW Trucking

Precast Products provided a Successful & On Time Project



For more information please contact Mike Kistner; Michael.Kistner@Kistner.com or call 585.762.8216

< prev  |  next >
8713 Read Road • P.O. Box 218 • East Pembroke, NY 14056 • Tel. 585.762.8216 • Fax 585.762.8315